The National Science Institute
694 vidéos, +112 000 abonnés


Liste de lecture:
Abbreviated Workday (Youtube)
Afficher la descriptionMasquer la description
The things we do day to day, but faster.
45 vidéos trouvées.


duréevues
Painting the Back Lot: Abbreviated Workday #453:521 896
Epoxying the Ground Level: Abbreviated Workday #444:1711 479
Renovating Large Scale Robotics: Abbreviated Workday #436:252 213
Building a Recording Studio: Abbreviated Workday #423:5610 429
Hanging at G.R. Comic Con: Abbreviated Workday #413:601 050
Renovating the VSL and Machine Shop: Abbreviated Workday #406:702 392
Prepping Collage & Steam Engine Kits: Abbreviated Workday #392:481 383
Assembling the Newton's Cradle for Maker Faire 2014: Abbreviated Workday #384:154 345
Building the Arts & Crafts Dept.: Abbreviated Workday #375:451 800
Painting the High Voltage Lab: Abbreviated Workday #365:132 991
Pressure Washing the High Voltage Lab: Abbreviated Workday #356:383 210
West Coast Donation Pickup: Abbreviated Workday #3428:802 414
Photo Shoot with Jeff: Abbreviated Workday #333:702 410
Safety Cribbing the Spark Gap Room: Abbreviated Workday #323:292 966
Building a Room for the SR-100: Abbreviated Workday #315:231 666
Painting the Board Room: Abbreviated Workday #306:19979
Rebuilding the Electronics Lab: Abbreviated Workday #296:302 283
Concrete Cutting Around the Lab: Abbreviated Workday #282:222 188
Starting Renovations in High Energy Physics: Abbreviated Workday #274:101 812
HVAC Work in Master Control: Abbreviated Workday #260:551 342
Renovating the Rapid Prototyping Lab: Abbreviated Workday #253:491 194
Building the New Production Sets: Abbreviated Workday #2410:541 201
Bringing the Museum/Archives Online: Abbreviated Workday #232:551 233
Roof Repairs Above Studio C: Abbreviated Workday #221:701 224
Applying Tiles to the New Autopsy Set: Abbreviated Workday #212:001 103
Painting a Hexagon Pattern on the Viewer Mail Set: Abbreviated Workday #202:212 265
A/V Gallery Overhaul: Abbreviated Workday #198:301 053
Painting the Viewer Mail Set in Studio C: Abbreviated Workday #181:481 139
Building the New Viewer Mail Video Sets (Day 2): Abbreviated Workday #172:35856
Building the New Viewer Mail Video Set (Day 1): Abbreviated Workday #162:511 036
Repairing Thumper, The High Impulse Generator: Abbreviated Workday #151:491 570
Clearing Out the AV Gallery for Cleaning and Painting: Abbreviated Workday #141:52938
More Painting and Prep-Work on the Studios: Abbreviated Workday #134:291 762
Trim Work and Gap Filling in the Production Studios: Abbreviated Workday #122:20926
Laying Armstrong Commercial Laminate Flooring in Studio A: Abbreviated Workday #113:252 929
Clearing the Old Gym Floor From Studio A: Abbreviated Workday #106:292 128
Electronics Kit Assembly & All Night Auto-Clutch Replacement: Abbreviated Workday #94:382 022
Building a Wall for Studio C: Abbreviated Workday #85:3211 982
Volunteer Army Spring Cleans the MDH: Abbreviated Workday #77:181 635
Roadtrip to Detroit! Huge Donation Pickup: Abbreviated Workday #66:102 042
Installing a Sub-Floor in Studio C: Abbreviated Workday #51:232 808
Mass CNC Batch Cutting - Haas SR-100 CNC Machine: Abbreviated Workday #45:174 040
Spray Painting Studios B & C: Abbreviated Workday #33:421 443
Spray Painting Studio A: Abbreviated Workday #24:601 818
Liebert Series 600 UPS Autopsy: Abbreviated Workday #13:133 997



Page d'Acceuil - À propos - Ajouter votre chaine.
Partager sur :

[Version mobile] [https://www.facebook.com/listubes]
Listubes, Copyright 2024